More bathroom work: all the sheetrock is gone now, and the installation of the new plumbing is coming on quite nicely.
Have to brag on my hubby again, he's a marvel with all this DIY. There's nothing he can't do.
Sunday, October 31, 2010
Halloween
Friday, October 29, 2010
So far, seven years safe
Tonight saw the removal of the mirror. Not wanting to suffer through a possible seven years of bad luck should breakage occur, we worked very carefully and slowly. Richard scored around the mirror first, then removed all the sheetrock from that wall.
Yep, the mirror and the square of sheetrock behind it came off after a bit of coaxing. No breakage, no bad luck. :)
Yep, the mirror and the square of sheetrock behind it came off after a bit of coaxing. No breakage, no bad luck. :)
Thursday, October 28, 2010
Sunday, October 24, 2010
The destruction begins
Our upstairs Jack-n-Jill bathroom is in dire need of renovating. It's got mold, mildew, and leakage beyond belief. I heard water from the tub dripping onto the ceiling while I was in the kitchen, downstairs. It's a wonder the tub hasn't fallen through the flooring to place a direct order in the kitchen.
Yesterday we began the demolition. Today neither hubby nor I could move, we're so sore and stiff. I look like an 80 year-old hobbling around, making the same sounds, too. God it's sad, I'm only 47.
The last pic is of our son's room -- we decided to take the opportunity of having a dumpster on the driveway for the bathroom to pull up the carpet in his room (he's away at college), so that we could put in wood flooring.
Expecting the new tub and surround, toilet, sheetrock, backerboard for the tiles, and 2x4x6's to be delivered on Tuesday.
Yesterday we began the demolition. Today neither hubby nor I could move, we're so sore and stiff. I look like an 80 year-old hobbling around, making the same sounds, too. God it's sad, I'm only 47.
The last pic is of our son's room -- we decided to take the opportunity of having a dumpster on the driveway for the bathroom to pull up the carpet in his room (he's away at college), so that we could put in wood flooring.
Expecting the new tub and surround, toilet, sheetrock, backerboard for the tiles, and 2x4x6's to be delivered on Tuesday.
Subscribe to:
Posts (Atom)